Traceability Sheets
- Crack Detection
- Crankcases awaiting assembly
- Setup Prior To Crankcase Skimming
- Crankcase Skimming
- Align Boring
- Attention To Detail
- Machining of oil pump housing
- Crankcase Spot-Facing
- Traceability Sheets
- Crankshaft Re-grinding
- Crankshaft Cleaning
- Crankshaft Assembly
- Part Assembled Engine
- Cylinder Head Assembly
- Valve/Seat Testing
- A completed engine prior to testing
- Hot Testing
- Oil Leak Detection During Testing
![]() |
|
![]() |
|
|---|---|
All engines are individually numbered and each stage of the rebuild process is recorded on special traceability sheets which you can see attached to the engines above.
|
|










